Route 340 Bridge, VA Department of Transportation (VDOT)

Front Royal, VA

$19.2M CEI project, including furnishing project manager and bridge inspection staff for construction of a new 9-span continuous steel girder bridge, and the rehabilitation and rebuild of an existing bridge, which was widened to 5 lanes. Work involved demolition of the superstructure and upper half of the substructure on the existing bridge, new lighting on the bridge and new signalization.