Woodrow Wilson Bridge Replacement General Engineering Consultant (GEC), SHA, VDOT, DDOT & FHWA

MD, VA & D.C.

$2.52B bridge replacement and re-design of 4 major interchanges; Phase I and Phase II property investigations for construction staging areas and potential mitigation sites; ROW purchase; and existing structure demolition recommendations; addressing solid waste disposal issues involving dredged material; undocumented landfill waste; contaminated soil; building demo debris (lead-based paint (LBP) and asbestos-containing materials (ACM)); remediation oversight for construction, operation, and decommissioning of 3-phase remediation system for petroleum contaminated groundwater on VDOT-owned properties.