I-95 (ETL) Segment 3, MD Transportation Authority (MDTA)

Baltimore, MD

$293M roadway improvement project involving construction documents, including Geotechnical Engineering Reports (GER's) for improvements to 6.5 miles of I-95, including the MD 43 interchange and bridge crossings. To explore subsurface conditions, drilled more than 790 SPT borings, 30 wells and performed 11 DMT and 17 CPT soundings. MOT for the drilling was complex and required close coordination with MDTA. All drill rig inspection was performed by RK&K's NHI accredited inspectors.