US 301 Project Development and General Engineering Consultant (GEC), DE Department of Transportation (DelDOT)

New Castle County, DE

$628M study, planning, environmental, design and GEC services for a new 14-mile multi-modal/tolled roadway, providing 4-lane, limited-access on a new alignment serving a vital role for regional and local travel. Tolling efforts included alternatives development; traffic analysis; study of tolling options; sensitivity analysis of toll rates/schedules; environmental technical studies; cost estimates; Draft/Final EIS and ROD; Financial and Project Management Plans; preparation of a Level 2 Traffic and Revenue report; and extensive public involvement.