Triangle Parkway Design-Build, NC Turnpike Authority (NCTA)

Wake & Durham Counties, NC

$137.4M, 3.4 mile design-build toll road project for the NC Transit Authority, including design and construction of a 6-lane divided and controlled access facility with a 46' median and meeting a 70 mph design speed. Project includes several new bridges, replacement bridge, noise wall and 1 additional lane added in the median.